Laserfiche WebLink
Remove temporary transformer and concrete pad. <br />RDA: Temporary Transformer & Pad <br />Item <br />Pad <br />Transformer <br />Length ft <br />15 <br />200 <br />Width ft <br />15 <br />Width (ft) <br />De dMei ht ft <br />1 <br />3 <br />Quantity <br />225 <br />5000 <br />Units <br />SF <br />LBS <br />Unit Cost <br />$4 <br />$0.13 <br />Total direct cost <br />$882 <br />$665 <br />Job supervision hours <br />6 <br />6 <br />Job supervision cost <br />$250 <br />$250 <br />Profit, insurance, and bond 12.60% <br />$111 <br />$84 <br />Contract = Direct + Overhead <br />$1,243 <br />$999 <br />En ineerin 4.25% of Contract <br />$53 <br />$42 <br />Reclamation management @6.0% of <br />Contract <br />$75 <br />$60 <br />Estimated bond <br />$1,371 <br />$1,101 <br />The RDA conveyor extension includes a 200 foot long truss mounted 36 inch wide conveyor and <br />two 150 foot long radial stackers. <br />RDA: Conveyor Belt Extension <br />Item <br />36" Belt <br />Radial Stacker <br />Radial <br />Stacker <br />Length ft <br />200 <br />150 <br />150 <br />Width (ft) <br />3 <br />3 <br />3 <br />Depth/height ft <br />3 <br />3 <br />3 <br />Quantity <br />200 <br />150 <br />150 <br />Units <br />LF <br />LF <br />LF <br />Unit cost <br />41.31 <br />41.31 <br />41.31 <br />Total direct cost <br />$8,262 <br />$6,197 <br />$6,197 <br />Job supervision hours <br />4 <br />4 <br />4 <br />Job supervision cost <br />$167 <br />$167 <br />$167 <br />Profit, insurance, and bond 12.60% <br />$1,041 <br />$781 <br />$781 <br />Contract = Direct + Overhead <br />$9,470 <br />$7,144 <br />$7,144 <br />Engineering 4.25% of Contract <br />$402 <br />$304 <br />$304 <br />Reclamation management @6.0% of <br />Contract <br />$568 <br />$429 <br />$429 <br />Estimated bond <br />$10,440 <br />$7,876 <br />$7,876 <br />MR-97 Exhibit 28- Page 194 Revised 09/28/11 <br />