My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-29_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2011-12-29_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:46:33 PM
Creation date
1/18/2012 9:24:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
12/29/2011
Doc Name
Bond Calculations (TR54, TR53, PR3, TR55, TR56, PR3, MR95, MR 97)
Section_Exhibit Name
Exhibit 28 Appendix B Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Remove 950 foot long extension of the RDA power line. <br />Remove RDA Power Line Extension <br />Item <br />36" Belt <br />12,470 Volt <br />500 <br />Lineal Feet of Extension <br />950 <br />Depth/height ft <br />3 <br />Cost per Lineal Foot for Removal <br />5.58 <br />Units <br />LF <br />Total Removal Cost <br />$ 5,301 <br />Total direct cost <br />$20,655 <br />Total Reclamation Expense <br />$ 5,301 <br />Job supervision hours <br />2 <br />Job supervision cost <br />$83 <br />Profit, insurance, and bond 12.60% <br />$668 <br />Contract = Direct+ Overhead <br />$6,052 <br />Engineering 4.25% of Contract <br />$257 <br />Reclamation management @6.0% of <br />Contract <br />$363 <br />Estimated bond <br />$6,673 <br />Remove 500 foot long accordion type 36" wide conveyor. <br />RDA: Conveyor 500' Portable Belt Extension <br />Item <br />36" Belt <br />Length ft <br />500 <br />Width ft <br />3 <br />Depth/height ft <br />3 <br />Quantity <br />500 <br />Units <br />LF <br />Unit cost <br />41.31 <br />Total direct cost <br />$20,655 <br />Job supervision hours <br />4 <br />Job supervision cost <br />$167 <br />Profit, insurance, and bond 12.60% <br />$2,603 <br />Contract = Direct + Overhead <br />$23,424 <br />Engineering 4.25% of Contract <br />$996 <br />Reclamation management @6.0% of <br />Contract <br />$1,405 <br />Estimated bond <br />$25,825 <br />MR -97 Exhibit 28- Page 193 Revised 09/28/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.