Laserfiche WebLink
December 15, 2011 C-1981-018/Deserado Mine ZTT <br /> punctured section of the wash down drainline will be repaired. <br /> Mine dewatering pond and channels are nearing completion.The flume has been constructed at the discharge point <br /> of the finishing pond. Embankments and channels have been reseeded. <br /> HRB-2, HRB-3, HRB-4 and Explosive Storage SAEs were inspected for proper sediment control measures. Each <br /> SAE is surrounded by berms diverting runoff to constructed rock check dams.No major signs of erosion were <br /> present and all check dams were stable. <br /> Water Storage Tank, Radio Tower,RDH-2 and B-Vent Shaft SAEs were constructed with gravel pads for <br /> sediment control measures.Each SAE were well graded with gravel and no major signs of erosion were present. <br /> !� z <br /> a <br /> t: AAA <br /> Culvert east of Refuse Pile 2/3/4. Sedimentation Pond RP-4. <br /> W4-- ` y <br /> • <br /> Rock check dam at explosives storage SAE. Mine dewatering pond flume. <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 3 of 5 <br />