My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981018 (17)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981018
>
_INSPECTION - C1981018 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 12:22:23 PM
Creation date
1/10/2012 9:51:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
From
DRMS
To
Blue Mountain Energy, Inc
Inspection Date
12/15/2011
Email Name
ZTT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 15,2011 C-1981-018/Deserado Mine ZTT <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection N -Roads <br /> N -Availability of Records N -Reclamation Success <br /> N -Backfill&Grading N -Revegetation <br /> N -Excess Spoil and Dev. Waste N - Subsidence <br /> N -Explosives N -Slides and Other Damage <br /> N -Fish&Wildlife N - Support Facilities On-site <br /> R -Hydrologic Balance R - Signs and Markers <br /> N -Gen. Compliance With Mine Plan N -Support Facilities Not On-site <br /> N -Other N - Special Categories Of Mining <br /> R -Processing Waste R -Topsoil <br /> COMMENTS <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1,4.05.2, 4.05.3; Siltation Structures 4.05.5,4.05.6; Discharge Structures 4.05.7, <br /> 4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring <br /> 4.05.13; Drainage—Acid and Toxic Materials 4.05.8; Impoundments 4.05.6,4.05.9; Stream Buffer Zones 4.05.18 <br /> Culverts within the main facility area were all clear. Little to no runoff was present in the main facility area during <br /> the time of inspection. <br /> The Scullion Gulch culvert entrance and exit was clean. Limited water was ponding at the discharge point of the <br /> culvert. <br /> Culvert on the east end of the Refuse Pile-2/3/4 was clear. Culverts between Refuse Pile 2/3/4 and Refuse Pile 5A <br /> were partially filled at the discharge points. <br /> Sedimentation pond DP-1 held water with no discharge.Ditches leading into the DP-1 pond from the main facility <br /> area were well armored with no erosion visible.Pond embankments were well vegetated with no instability issues. <br /> Sedimentation pond RP-2/3 held limited water in the two southern cells with no discharge into the northern cell. <br /> The north cell held no water. <br /> Sedimentation ponds RR-1, RP-4 and RP-5 held no water at the time of the inspection. Pond embankments were <br /> well vegetated with no signs of instability and erosion. <br /> The punctured wash down drainline had moisture visible at the base of the pipe through the punctured section.The <br /> punctured section is inside the ditch leading into sedimentation pond RR-1. It appears that if any discharge from <br /> the punctured section would occur,it would flow into sedimentation pond RR-1. Scott Wanstedt stated the <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.