Land Status Category
<br />Last Years
<br />Cumulative
<br />Total
<br />This Calendar
<br />Year
<br />Cumulative Total
<br />Acres Disturbed
<br />45.31
<br />+
<br />0.0
<br />=
<br />45.31
<br />Acres Backfilled & Graded
<br />41.93
<br />+
<br />0.0
<br />=
<br />41.93
<br />Acres topsoiled
<br />41.93
<br />+
<br />0.0
<br />=
<br />41.93
<br />Colorado Division of Reclamation, Mining and Safety
<br />Annual Reclamation Report for the Year 2011
<br />Mine Name: CARBON JUNCTION MINE Permit Number. C - 1992 - 080 Permittee: OAKRIDGE ENERGY
<br />Address: 4613 Old Jacksboro Highway, Wichita Falls, Texas 76302
<br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon
<br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other
<br />reclamation monitoring data as required by the approved permit. The location of all of the areas reported
<br />should be clearly depicted on a map included with the report.
<br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for each
<br />category below. Do not include acres that have achieved final, Phase III release.
<br />* Include, if necessary, a description of any augmented seeding or cultural practices.
<br />For the Entire Life of Mine, the total number of acres disturbed 59.0 acres (includes acreage subsequently incorporated
<br />into the Four Corners Materials Ewing #1 aggregate operation permit, +1 - 11.5 acres) and the total number of acres:
<br />Phase I released: 47.69 ac.* Phase II released: 47.69 ac.* Phase III released: 17.69 ac. (SL -02)*
<br />* includes acreage approved in TR16: Retention of topsoil stockpiles (3.38 acres).
<br />For Mines in Permanent Cessation:
<br />Total acreage in facilities subject to reclamation but yet to be completed 0.0 acres
<br />For Govemment Performance and Results Act
<br />Acreage in long -term mining or reclamation facilities 0.0 acres
<br />Acreage in active mining areas 0.00 acres
<br />1 exclude areas where Phase III release has been achieved
<br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and
<br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas;
<br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and
<br />coal mine waste impoundments; head -of- hollow fills; valley fills; ventilation shafts and entryways; and non -coal waste disposal area
<br />(garbage dumps and coal combustion by- products disposal areas).
<br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded
<br />Last Years
<br />Cumulative
<br />Total
<br />This
<br />Calendar
<br />Year
<br />Cumulative
<br />Total'
<br /><10
<br />years
<br />>10
<br />years'
<br />Acres .
<br />seede
<br />+
<br />0.0
<br />+
<br />41.93
<br />=
<br />41.93
<br />+
<br />0.0
<br />Colorado Division of Reclamation, Mining and Safety
<br />Annual Reclamation Report for the Year 2011
<br />Mine Name: CARBON JUNCTION MINE Permit Number. C - 1992 - 080 Permittee: OAKRIDGE ENERGY
<br />Address: 4613 Old Jacksboro Highway, Wichita Falls, Texas 76302
<br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon
<br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other
<br />reclamation monitoring data as required by the approved permit. The location of all of the areas reported
<br />should be clearly depicted on a map included with the report.
<br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for each
<br />category below. Do not include acres that have achieved final, Phase III release.
<br />* Include, if necessary, a description of any augmented seeding or cultural practices.
<br />For the Entire Life of Mine, the total number of acres disturbed 59.0 acres (includes acreage subsequently incorporated
<br />into the Four Corners Materials Ewing #1 aggregate operation permit, +1 - 11.5 acres) and the total number of acres:
<br />Phase I released: 47.69 ac.* Phase II released: 47.69 ac.* Phase III released: 17.69 ac. (SL -02)*
<br />* includes acreage approved in TR16: Retention of topsoil stockpiles (3.38 acres).
<br />For Mines in Permanent Cessation:
<br />Total acreage in facilities subject to reclamation but yet to be completed 0.0 acres
<br />For Govemment Performance and Results Act
<br />Acreage in long -term mining or reclamation facilities 0.0 acres
<br />Acreage in active mining areas 0.00 acres
<br />1 exclude areas where Phase III release has been achieved
<br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and
<br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas;
<br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and
<br />coal mine waste impoundments; head -of- hollow fills; valley fills; ventilation shafts and entryways; and non -coal waste disposal area
<br />(garbage dumps and coal combustion by- products disposal areas).
<br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded
<br />
|