Laserfiche WebLink
• <br />i • <br />r1 <br />LJ <br />NORTHWEST MAINS REORIENTATION (MR 03-182) <br />Lube Building Removal at Northwest Vent Shaft <br />Building Removal <br />15' x 12' x 10' x $0.13/cf <br />Demolish concrete pad <br />IS' x 12' x $2.30/sf <br />Demolish Piers (4) to depth of four feet <br />1.5'x4'x4 <br />$ 234 <br />$ 414 <br />$ 28 <br />Subtotal $ 676 <br />VFD Building at Northwest Vent Shaft <br />Building Removal <br />11' x 32' x 10' x $0.13/cf <br />Demolish concrete pad <br />11' x 32' x $2.30/sf <br />Demolish Piers (4) to depth of four feet <br />1.5'x4'x4 <br />Sealing of Power Drop Borings <br />Grouting of four inch cased boring <br />4" casing x 1410' = 16.4 CY x $90/CY <br />Rig - 8 hrs x $125/hr <br />Grouting of eight inch cased boring <br />8" casing x 1410' = 59CY x $90/CY <br />_ Rig -12 hrs x $125/kv <br />$ 458 <br />$ 810 <br />$ 28 <br />Subtotal $1296 <br />$1476 <br />$1000 <br />$5312 <br />$1500 <br />Subtotal $9288 <br />Subtotal -Direct Costs <br />Indirect and Administrative Costs (17.5%) <br />Project Total Cost <br />PR 03-06 <br />$11,260 <br />$ 1,971 <br />$13,231 <br />101 03/]7/04 <br />