Laserfiche WebLink
EXPANSION OF LOW QUALITY COAL STOCKPILE (MR 02-181) <br />Utility Building Removal at Escape Shaft <br />Building Removal <br />10' x 10' x 10' x $0.13/cf $ 130 <br />Demolish concrete pad <br />10' x 10' x $2.30/sf 230 <br />Subtotal $ 360 <br />Pushing Low Quality Coal into pit <br />50,000 cy x $0.47/cy Subtotal $23,500 <br />Subtotal -Direct Costs $23,860 <br />360 <br />Indirect and Administrative Costs (17.5%) $4,175 <br />54 <br />Project Total Cost $28,036 <br />MR 02-181 100 11/22/02 <br />