My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-17_PERMIT FILE - C1982056A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2011-11-17_PERMIT FILE - C1982056A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:06 PM
Creation date
12/22/2011 9:15:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
11/17/2011
Section_Exhibit Name
Appendix A Bonding Calculations Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NMD Power Borehole Bond Calculetlon5 (TR 00.37) <br />• <br /> Road Exbnslon (2,500') <br /> CuNen Removal <br /> 30' - 12' diameter 0 f7.36M = E 221 <br /> Ripping <br /> Use D10N Dozer <br /> Average Speetl = 1 mph <br /> 0,86 acres O 2 feet deep = 2,775 BCY <br /> 2,775 BCV O 1,796 BCY/hr = 1.55 hrs <br /> 1.55 hrs x 5198.67mr = E 308 <br /> Topsoil Replacement <br /> Use DB Dozer <br /> Average push tlistence 300 M <br /> 2,775 BCV O 1.125 swell factor = 3,121.88 <br /> 3,122 LCY O 58.04 LCYOx = 53.79 <br /> 53.79 hrs x f71.41R1r = f 3,841 <br /> Revageblbn <br /> Assume cast for seed, disNNr9, harmwsrg, <br /> contour furtowing, antl lerslizauon O 5285.66/acre <br /> O.B6 acres x E285.fi4 = f 246 <br /> Tobl Raetl Extension Cost S 1,616 <br /> Sib Worts (200' a 200') <br /> Ripping -Use D10N Dozer <br /> 0.92 acres O 2' tleep = 2968 BCY <br /> 2,969 BCY O 1,796 BCVmr = 1.7 hrs <br /> 1.7 hrs x E198.67/hr = E 328 <br /> Topsoil Replacement <br /> Use D6 Dozer <br /> Average push tlLSterlce 300 K <br /> 2,963 BGV O 1.125 swell faGlor 3333 LCY <br />• 3,333 LCV O 58.04 LCYrhr 57.43 <br /> 57.43 hrs z 571.41mr = f 4,101 <br /> Revegebtion <br /> Assume cost for seed, diskirlg, harrowing, <br /> conour turtowing, and IernlizeEOn O 5285.6Mecre <br /> 0.92acres x (285.64 = E 263 <br /> Total Slb Area Cost f 4,691 <br /> Power Llne <br /> Approximately 12,000 n wootl erq wire O 51.88115 = f 22.560 <br /> $absbtlOn $iN01Uree <br /> Translortner Concrete Pads- <br /> 3 x 15' • 12' =540 t11 x 56.68 f 3,607 <br /> Switchgear/Control Builtlirg - <br /> 14' x 30' a 8' = 3,360 CF O f0.1fl1CF E 605 <br /> SwilchgearrCOnirol Buil0ing Fountlaoon <br /> 14'x30' = 420 t2 x E6.68 = E 2.806 <br /> Fence Removal <br /> 344 n x f1.68M = f 647 <br /> 7obl Subsbtlon Structures Cost f 7,660 <br /> Power BoreMle <br /> Manhole Vault - 5' x 5'x 5' = 4.6ty x S6.fielty 31 <br /> Drill Rig for Grouting est. 32 hrs O f125lhr = 4.000 <br /> 157 ty grout O f 110/ty, delivered = 17.270 <br /> 7obl Borehole Cost S 21,301 <br /> Subtotal f 60,832 <br /> Admin (8%) 5 4,867 <br />• Tobl Recbmatlon Cost S 85,699 <br /> A~9~93®9~E9B JUN 1 4 2000 <br />TR OP37 88 O5r1 SAO <br />
The URL can be used to link to this page
Your browser does not support the video tag.