Laserfiche WebLink
TR 00-35 Techincal Revision to the Operation of the Fish Creek Borehole Treament Faciltiy <br />Reclamation Costs <br />Road Realignment (250'), Minor Changes Total 300', and Truck Turnaround (200') <br />Ripping - .258 acse @ 2' deep = g33 BCY11,238.76 BCYIhr <br />0.67 hrs @ $65.88 <br />Final Grading - 750' x 15' Q 2' = 967 LCY1228.99 LCYIhr = <br />4.22 @ $62.601hr <br />Topsoil Replacement - 750' x15' @ 2' = 1,041.67 LCY/180.73 LCY/hr = _ <br />5.76 @ $fi2.60/hr <br />Subtotal = <br />Power Poles <br />Approximately 1,00011' wood and wire @ $1,8811f <br />Temporary Storage Structure <br />Structure 30' x 8' x 8' = 1,920 cf @ $.18/cf <br />• <br />Remote Monitoring Equipment <br />Equipment Removal and Conduit (2 x 50') - 100' @ $4.72/lf <br />Total = <br /> <br />$ 44.27 <br />$ 264,26 <br />$ 360.81 <br />$ 669.34 <br />$ 1,880.00 <br />$ 345.60 <br />$ 472.00 <br />$ 3,366.94 <br />APPROVED APR 1 4 2DOD <br />7R DA-35 g7 <br />A3~2A»AA <br />