Laserfiche WebLink
Attachment 2.05.3(3) -17 <br />WFC Letter to Retain All Buildings and Structures in Table 2.05.3(3) -4 .......... <br />Attachment 2.05.3(3) -18 <br />NPDES Discharge Permit JUNE 30, 2013 ................................ <br />Attachment 2.05.3(3) -19 <br />Demonstration of Retention for Pond 008 ................................. <br />Attachment 2.05.3(3) -20 <br />Pond 011 As Built (TR -56) ............................................. <br />Attachment 2.05.3(3) -21 <br />Pond 013 As Built (TR -56) ............................................. <br />Attachment 2.05.3(3) -22 <br />Pond 015 Design 100YR -24HR, Full Containment .......................... <br />Attachment 2.05.3(3) -23 <br />Seismic Survey (MR -78) .............................................. <br />Attachment 2.05.3(3) -24 <br />Pond 015- As Built (TR -60) ............................................ <br />MAPS <br />Map 2.05.3(3) -1 Surface Hydrology <br />Map 2.05.3(3) -1 -2 Post Mine Surface Hydrology <br />Map 2.05.3(3) -2 Operations Plan Variance to Leave Turn Slot <br />Map 2.05.3(3) -2 -1 Pond 007 As -Built <br />Map 2.05.3(3) -2 -2 Modified Pond 007 Drainage Area <br />Map 2.05.3(3) -3 Utility Relocation <br />Map 2.05.3(3) -4 -1 Pond 008 Drainage Area <br />Map 2.05.3(3) -4 -2 Pond 008 As -Built <br />Map 2.05.3(3) -5 -1 Pond 009 As -Built <br />Map 2.05.3(3) -6 -1 Ponds 010 and 013 Layouts <br />Map 2.05.3(3) -8 Mine Roads <br />Map 2.05.3(3) -9 BB Detour Road Plan <br />Map 2.05.3(3) -10 BB Detour Road Profile <br />Map 2.05.3(3) -11 Pond 014 As -Built <br />Map 2.05.3(3) -12 -1 Pond 012 Design <br />(Revised June 2011) <br />