My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-30_PERMIT FILE - C1981008A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2011-11-30_PERMIT FILE - C1981008A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:30 PM
Creation date
12/20/2011 8:28:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
11/30/2011
Doc Name
Mine Facilities
Section_Exhibit Name
Section 2.05.3(3) Mine Facilities
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENTS <br />Attachment 2.05.3(3) -1 <br />Collection /Diversion Ditches and Culverts Design Parameters ................. <br />Attachment 2.05.3(3) -2 <br />As Built Calculations of Pond 007 ....................................... <br />Attachment 2.05.3(3) -3 <br />Typical Soil Grain Size Analysis ........................................ <br />Attachment 2.05.3(3) -4 <br />Pond 008 As -Built ................................................... <br />Attachment 2.05.3(3) -5 <br />Pond 009 As -Built .................... ............................... <br />Attachment 2.05.3(3) -6 <br />Ponds 013 As Designed Calculations .................................... <br />Attachment 2.05.3(3) -7 <br />Small Area Exemption ................................................ <br />Attachment 2.05.3(3) -8 <br />County Agreement And Montrose County Road Easement Agreement .......... <br />Attachment 2.05.3(3) -9 <br />Rockfill Embankment Specifications 5T" Street Road ........................ <br />Attachment 2.05.3(3) -10 <br />Exploration Drill Holes ................................................ <br />Attachment 2.05.3(3) -11 <br />Pond 014 Storm Volume Calculations .................................... <br />Attachment 2.05.3(3) -12 <br />Sediment Pond 012 Engineering Design .................................. <br />Attachment 2.05.3(3) -13 <br />Pond 012 As Built ................................................... <br />Attachment 2.05.3(3) -14 <br />Pond 011 Engineering and Hydrologic Design ............................. <br />Attachment 2.05.3(3) -15 <br />Pond Slope Stability Analyses .......................................... <br />Attachment 2.05.3(3) -16 <br />Demonstration For Retention of Pond 007 ................................ <br />(Revised June 2011) <br />
The URL can be used to link to this page
Your browser does not support the video tag.