My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-01_PERMIT FILE - C1981008A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2011-11-01_PERMIT FILE - C1981008A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:30 PM
Creation date
12/19/2011 2:05:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
11/1/2011
Doc Name
Revegetation
Section_Exhibit Name
Section 2.05.4(2)(e) Revegetation
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2 Irrigation Desions <br />For Irrigated Cropland areas, all irrigation designs have been based on calculations from the local <br />NRCS representative, Jim Boyd. Irrigation will be accomplished with side roll sprinklers and flood <br />irrigation supplied by 4 inch to 10 inch supply lines. Water will be applied at a rate based on the <br />irrigation calculations presented in Attachment 2.05.4(2)(e) -7 (IC). <br />The irrigation designs for the Morgan property IC areas use a differentfield labeling than the pre- <br />mine field designations. The post -mine fields and brief descriptions of the irrigation type (sideroll <br />or flood) can be seen on Map 2.05.4 -5, with the old Morgan field labels shown for comparison. <br />Field A Northwest field on Morgan property; irrigated by sideroll; see Sideroll Irrigation <br />Design in Attachment 2.05.4(2)(e) -7. <br />Field B Southwest field on Morgan property; irrigated by sideroll; see Sideroll Irrigation - <br />Morgan Design in Attachment 2.05.4(2)(e) -7. <br />Field C North- central field on Morgan property; irrigated by sideroll; see Sideroll Irrigation <br />Design - Morgan in Attachment 2.05.4(2)(e) -7. <br />Field D Northeast field (Sunshine Corner) on Morgan property; flood irrigated; see Flood <br />Irrigation Design - Morgan Sunshine Corner in Attachment 2.05.4(2)(e) -7. <br />Field E South - central triangular field on Morgan property; flood irrigated; see Flood <br />Irrigation Design - Morgan Triangle in Attachment 2.05.4(2)(e) -7. <br />The NRCS supplied full calculations for irrigating 97.5 acres of the Morgan property, using 50 <br />shares of the CCC Ditch. The Morgans have agreed to supply 62 shares of water and supplement <br />it with whatever is needed in a particular year, to ensure that their entire property within the permit <br />area is irrigated. This letter is provided in Attachment 2.05.4(2)(e) -7. Map 2.05.4 -5 shows the <br />layout of each of the three sideroll irrigated fields proposed for the Morgan property, and the two <br />flood irrigated areas on the Moran property. <br />(Revised: PR -06) 2.05.4(2)(e) - 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.