Laserfiche WebLink
Where: <br />t = calculated t -value <br />X = bond release site (reclaimed site) sample mean <br />X, = reference area sample mean <br />The null hypothesis being tested is that the mean value for the reclaimed site is less than or equal <br />to Q. If the calculated t value is greater than the table t value (alpha = 0.20, df sat ), then the null <br />hypothesis is rejected and revegetation is deemed successful for the parameter in question <br />4.6 Liabilitv Period Management - Reclaimed Irriaated Pastureland <br />Maintenance activities will include the normal monitoring for and repair of excessive rifling or <br />gulling, weed and pest control. The rill and gully management and stabilization plan is detailed <br />after the end of this section. Weed and pest control management will be conducted as necessary <br />and in accordance with the plan described after the end of this section. <br />Irrigation management on irrigated pasturland will follow similar sequence as irrigated cropland <br />since the source of irrigation water is the same (CCC ditch). This can be seen in subsection 5.7.4. <br />However irrigated pastureland will not use a sideroll; all irrigation is flood on IP <br />4.6.1 Fertilzation Plan <br />Initial fertilization of Reclaimed Irrigated Pastureland soils will take place during topsoil preparation <br />procedures as described in Section 2.05.4(2)(d) subsection 13.2. Beyond the first year of the <br />liability period, nitrogen and phosphorus will be applied to the Reclaimed Irrigated Pastureland <br />(Revised: PR -06) 2.05.4(2)(e) - 37 <br />