Laserfiche WebLink
-T MONITORING REQUIREMENT SUMMARY <br /> SAN LUIS PROJECT <br /> T 1.0 General <br /> Monitoring and observation programs will be conducted to confirm that <br /> T the performance of the San Luis Project is satisfactory, to refine analyses <br /> and modify designs, and to document the performance for review by <br /> regulatory agencies. The level and quality of groundwater, pit inflows, <br /> and quality of surface water, the level of the phreatic surface in the <br /> tailings embankment, the settlement of embankment, freewater pond volumes, <br /> and the embankment and disposal area levels will be monitored and recorded <br /> systematically. Almost continuous visual observations of the mining <br /> project will be conducted by the operating personnel . Significant <br /> observations will be recorded. <br /> The development of the monitoring <br /> observation well locations, sampling type and program details <br /> frequency,qch as <br /> _ possible pieiometer locations will be an evolutionary and <br /> throughout construction and operation of the project process continuing <br /> ' For this reason, the observation and monitoring program g plans <br /> outlined herein should be viewed as subject to change during the operations <br /> T' as necessary to ensure comprehensive site monitoring. <br /> During operation,' visual observations will be made of the tailings <br /> disposal facilities on a daily basis to check the condition of the <br /> embankment, disposal area, pipelines, and water control facilities. <br /> Prior to tailings deposition, an operator's manual will be written <br /> which will explain the general design criteria and what to look for during <br /> operation. The operator's manual will contain standard forms for recording <br /> i <br /> and reporting observations from visual inspections and data obtained from <br /> monitoring systems. <br /> 71 01 321 <br />