Laserfiche WebLink
AMEC observed the structural fill placement. Ambient and fill temperatures were monitored during fill <br />placement. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Work activities were paused for the winter under the direction of CC &V. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CCU V: <br />CC &V held a weekly construction meeting on November 15, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />None <br />Summary of Incidents /Accidents/Health & Safety Issues: <br />None <br />ame6 <br />We trust the information provided clearly represent, ur findings and observations for the week ending <br />November 19, 2011. <br />Joseph. Hickey, CQA Monito ate: November 19, 2011 <br />Approved By: te: <br />(04 ��c1I <br />PSES Weekly Report WE 11.19.2011 <br />