My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-09_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2011-12-09_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
12/13/2011 2:15:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
12/9/2011
Doc Name
Weekly VLF Earthworks Field Monitoring Report: Week of 11/13/2011.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />- <br />D = Day Shift N = Night Shift <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Process Solution Enhancement System <br />Date: November 19, 2011 <br />Reporting Period: 11/13/11 through 11/19/11 <br />Ambient Temperature Range (F): Low: 15 °F to 27 °F ( + / -) High: 28 °F to 59 °F ( + / -) <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES/Lonestar: Work activities were paused for the winter under the direction of CC &V. This will be <br />the last report submitted. Reports will resume when construction activities resume. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Process Solution Enhancement System (PSES) <br />A) Cut to Fill <br />Structural fill placement was performed using a CAT 375 excavator to load 40 -ton articulating <br />haul trucks from a borrow source designated by CC &V and hauled to fill areas within the PSES. <br />Structural fill was placed in 18" to 24" lifts using two CAT D -6 LGP dozers. Each lift was <br />moisture conditioned using a tandem axle water truck (when necessary) and compacted using a 10- <br />ton vibratory smooth drum compactor, passing over the entire fill surface at least 4 times (method <br />compaction technique is applicable). The area was set to finish grades that were surveyed prior to <br />the project start. Ambient and fill temperatures were monitored during fill placement. <br />Work activities were paused for the winter under the direction of CC &V. <br />CQA ACTIVITIES: <br />Project No.: 84201125E0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />PSES Weekly Report WE 11.19.2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.