2011-12-09_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-12-09_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
12/13/2011 2:15:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/9/2011
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: Week of 11/13/2011.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />DCF Process <br />34,252 <br />591,758 <br />Total <br />34,252 <br />591,758 <br />II) Storm Water Management <br />A) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />Processing of Drain Cover Fill (DCF) continued at the DCF process area using a CAT dozer. <br />IV)VLF Geosynthetics <br />A) Geomembrane Installation <br />Geomembrane installation for the Phase 5 VLF project is complete. Repairs are made if necessary <br />during DCF placement. <br />B) Geomembrane Exposure <br />No work performed during the week. <br />CQA ACTIVITIES: <br />SUMMARY: <br />An AMEC representative monitored ambient temperatures on an hourly basis during fill <br />placement. Fill temperatures were monitored during ambient temperatures below 32 ° F and <br />averaged 35 °F to 37 ° F. <br />Drain Cover Fill placement for the Phase 5 Valley Leach Facility is complete. <br />one <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed snow removal within the Phase 5 VLF. <br />AMEC observed the installation of the high volume solution collection system within the Phase 5 VLF. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process area. <br />AMEC observed the DCF placement within the Phase 5 VLF. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />VLF Weekly Report WE 11.19.2011 <br />