Laserfiche WebLink
Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />- <br />D = Day Shift N = Night Shift <br />amed <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: November 19, 2011 <br />Reporting Period: 11/13/11 through 11/19/11 <br />Ambient Temperature Range (F): Low: 15 °F to 27 °F ( + / -) High: 28 °F to 59 °F ( + / -) <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES/Lonestar: Construction of the Phase 5 Valley Leach Facility was completed Friday <br />November, 18, 2011. This will be the last Weekly Report submitted for the Phase 5 VLF <br />construction. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) EARTHWORKS <br />A) VLF <br />Construction of the Phase 5 Valley Leach Facility is complete. <br />Project No.: 84201125E0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />B) High Volume Solution Collection System <br />1) High Volume Solution Collection Piping <br />Placement of the high volume collection system continued at the DCF placement area shown <br />on Figure 1, advancing in front of the placement. CPeP was placed and sandbagged in <br />accordance with design drawings and project specifications. <br />2) Drain Cover Fill (DCF) <br />Drain cover fill (DCF) placement within the Phase 5 VLF continued. DCF was placed in the <br />areas shown on Figure 1. The DCF was hauled from the processing area to the placement area <br />using 40 -ton articulating haul trucks. The DCF was placed in a 2 -foot lift using various CAT <br />dozers except where haul routes were established. Haul route consisted of five -foot lifts to be <br />spread into 2 -foot lifts later. Laborers were present at all times during placement holding the <br />high volume collection piping in place, removing debris /sandbags, and assisting the dozer <br />operator with lift thickness. All DCF was placed on previously approved primary <br />geomembrane. AMEC field representatives monitored the DCF placement constantly. <br />VLF Weekly Report WE 11.19.2011 <br />