Laserfiche WebLink
J. J. Dudash <br />-2- December 5, 2011 <br />Bear- The pipes do dip down and then back up. This pipe configuration along with <br />the vertical pipe are components of the siphon break. <br />5. DRMS - On proposed revised pages 2.05 -ii and 2,05 -23, please add that the <br />CDPHE approval and a revised NPDES permit will also be obtained before the <br />bypass pipeline is put into service. <br />Bear - Pages 2.05 -ii and 2.05 -23 were amended as requested. <br />6. DRMS - The last sentence on proposed revised page 2.05 -23 states that the pond's <br />design parameters can be found on page 11 -14. The Division's copy of the permit <br />application does not include a page 11 -14. Please provide a copy of page 11 -14. <br />Bear - Enclosed is page 11 -14. <br />Amended pages 2.05 -ii, 23, page 11 -14 and drawing 11 -4 are enclosed. Please call if you <br />have any questions. <br />Sincerely, <br />E. over, P.E. <br />Consulting Engineer <br />