My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-12-08_REVISION - C1981033
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981033
>
2011-12-08_REVISION - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:57 PM
Creation date
12/9/2011 7:30:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
REVISION
Doc Date
12/8/2011
Doc Name
Responses to DRMS Comments and Concerns
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR29
Email Name
JJD
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINE ENGINEERING <br />MINE RECLAMATION <br />December 5, 2011 <br />J. J. Dudash <br />Division of Reclamation Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bear Coal Company <br />Technical Revision Application TR -29 <br />Pond Bypass Pipeline <br />Permit C- 1981 -033 <br />Dear Mr. Dudash: <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7 STREET, UNTI B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />The DRMS' letter dated November 23, 2011 transmitted its adequacy review for the <br />referenced technical revision. On behalf of Bear Coal Company, Inc., following are its <br />responses to the DRMS' comments and concerns: <br />1. DRMS - On Drawing 11 -4, please add a note that the pipelines from the treatment <br />pond and the pipeline that is proposed in TR -29 are buried. <br />Bear - The requested note was added to drawing 11 -4. <br />2. DRMS - Please consider realigning the intersection of the bermed ditch and the <br />proposed pipeline so that there isn't a sharp 90 degree turn, as is shown on <br />Drawing 11 -4. <br />Bear - A note was added to drawing 11 -4 that states the ditch and berm will be <br />realigned during the change over to the bypass line. <br />3. DRMS - In the Pond Inlet Detail on Drawing 11 -4, please explain the meaning of the <br />statement "Gravel Pad Remaining after Reclamation ". The Division is not aware of <br />any gravel pad that is permitted to remain after reclamation. <br />Bear - The subject note was removed from the drawing. <br />4. DRMS - In both the Primary Spillway Detail and the Emergency Spillway Detail on <br />Drawing 11 -4 there is a designation of the "Sediment Pond Level" shown where the <br />buried pipeline from the treatment pond goes down in elevation and then back up. <br />Please explain what this designation represents and whether or not the buried <br />pipeline actually dips down and, then, back up. <br />
The URL can be used to link to this page
Your browser does not support the video tag.