My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-27_REVISION - C1980001
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980001
>
2011-10-27_REVISION - C1980001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:24 PM
Creation date
12/8/2011 10:39:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
REVISION
Doc Date
10/27/2011
Doc Name
Cost Estimate
From
DRMS
To
Chevron Mining
Type & Sequence
RN6
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />( %) <br />( %) <br />(min) • <br />1 <br />1400.00 <br />2.00 <br />5.00 <br />7.00 <br />1362 <br />1.10 <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(CAT HB) <br />Job Efficiency: <br />( %) <br />( %) <br />( %) <br />(min) <br />1 <br />1400.00 <br />-2.00 <br />5.00 <br />3.00 <br />2949 <br />0.62 <br />Scraper Worksheet Cont'd Task # 002 Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Net Correction: <br />Return Route: <br />0.830 <br />NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Haul Time: <br />Return Time: <br />Unit cost: $0.831 /LCY Total job cost: $78,257.89 <br />Site Altitude: 7500 feet <br />1.10 minutes <br />0.62 minutes <br />Total Scraper team cycle time: 3.32 minutes <br />Adjusted for job conditions: 870.00 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 870.00 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 870.00 LCY/Hour <br />Unadjusted unit production/hour: 1,048.19 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 108.20 Hours <br />CIRCES Cost Estimating Software <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Scraper Worksheet Cont'd Task # 002 Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Net Correction: <br />Return Route: <br />0.830 <br />NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />Haul Route: <br />Haul Time: <br />Return Time: <br />Unit cost: $0.831 /LCY Total job cost: $78,257.89 <br />Site Altitude: 7500 feet <br />1.10 minutes <br />0.62 minutes <br />Total Scraper team cycle time: 3.32 minutes <br />Adjusted for job conditions: 870.00 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 870.00 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 870.00 LCY/Hour <br />Unadjusted unit production/hour: 1,048.19 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 108.20 Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.