My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-27_REVISION - C1980001
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980001
>
2011-10-27_REVISION - C1980001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:24 PM
Creation date
12/8/2011 10:39:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
REVISION
Doc Date
10/27/2011
Doc Name
Cost Estimate
From
DRMS
To
Chevron Mining
Type & Sequence
RN6
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Edna Strip Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Cost Breakdown: <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />002 <br />10/27/2011 <br />JHB <br />Topsoil 77.8 acres @ West Ridge <br />State: Colorado <br />County: Routt <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Total work team cost/hour: $723.24 <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Scraper Work Team <br />MATERIAL QUANTITIES <br />Initial volume: 94,138 CCY <br />Loose volume: 94,138 LCY <br />Source of estimated volume: MT5 <br />SCRAPER TEAM WORK <br />Equipment Description <br />Cat 637G w /push -pull <br />NA <br />NA <br />NA <br />NA <br />NA <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />2,550 lbs /LCY <br />Earth - Dry packed <br />81,600 pounds <br />32.00 LCY <br />Permit Action: Permit Renewal No. 6 <br />COSTShift basis: 1 per day <br />Swell factor: 1.000 <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />Permit/Job #: , C1980001 <br />Abbreviation: None <br />24.00 <br />34.00 <br />29.00 <br />29.00 <br />Page 1 of 2 <br />Filename: CO01 -002 <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />4 - 4 <br />Load Area <br />- - - <br />Dump Area <br />- - - -- <br />Motor Grader <br />n-r <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$103.90 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$232.77 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$361.62 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$723.24 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Task description: <br />Site: Edna Strip Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Cost Breakdown: <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />002 <br />10/27/2011 <br />JHB <br />Topsoil 77.8 acres @ West Ridge <br />State: Colorado <br />County: Routt <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Total work team cost/hour: $723.24 <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Scraper Work Team <br />MATERIAL QUANTITIES <br />Initial volume: 94,138 CCY <br />Loose volume: 94,138 LCY <br />Source of estimated volume: MT5 <br />SCRAPER TEAM WORK <br />Equipment Description <br />Cat 637G w /push -pull <br />NA <br />NA <br />NA <br />NA <br />NA <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />2,550 lbs /LCY <br />Earth - Dry packed <br />81,600 pounds <br />32.00 LCY <br />Permit Action: Permit Renewal No. 6 <br />COSTShift basis: 1 per day <br />Swell factor: 1.000 <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />Permit/Job #: , C1980001 <br />Abbreviation: None <br />24.00 <br />34.00 <br />29.00 <br />29.00 <br />Page 1 of 2 <br />Filename: CO01 -002 <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.