My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-27_REVISION - C1980001
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980001
>
2011-10-27_REVISION - C1980001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:24 PM
Creation date
12/8/2011 10:39:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
REVISION
Doc Date
10/27/2011
Doc Name
Cost Estimate
From
DRMS
To
Chevron Mining
Type & Sequence
RN6
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 - <br />(FND -RF) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Bulldozer Worksheet Cont'd <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Total job time: <br />Total job cost: <br />Net correction: 0.4462 <br />Adjusted unit production: 941.71 LCY /hr <br />Adjusted fleet production: 941.71 LCY /hr <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />1 Dozer(s) <br />$0.283/LCY <br />1.91 Hours <br />$509.44 <br />Task # 025 <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.