Laserfiche WebLink
Task description: <br />Site: Edna Strip Mine <br />PROJECT IDENTIFICATION <br />Task #: 025 <br />Date: 10/28/2011 <br />User: JHB <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Agency or organization name: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />Average push gradient: <br />Average site altitude: <br />Reclamation of Moffat Area Collection ditch <br />Cat D9T - 9SU <br />405 <br />Semi- Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />$266.52 <br />$266.52 <br />MATERIAL QUANTITIES <br />1,600 <br />1.125 <br />1,800 LCY <br />State: <br />County: <br />BULLDOZER WORK <br />Permit Action: Permit Renewal No. 6 Permit/Job #: C1980001 <br />$80.19 <br />$140.68 <br />$7.17 <br />$38.49 <br />DRMS <br />Colorado <br />Routt <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production: 2,110.5 LCY/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />5% <br />7,500 feet <br />Material weight: 2,550 lbs/LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 1.100 <br />Dozing method: 1.000 <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: CO01 -025 <br />CIRCES Cost Estimating Software <br />