Laserfiche WebLink
SAND & GRAVEL PRODUCTS <br />Phone 242 -7537 <br />November 23, 2011 <br />�v�,555 <br />WHITEWATER BUILDING MATERIALS CORPORATION <br />Travis Marshall <br />Division of Reclamation, Mining and Safety <br />101 S. 3 Street <br />Grand Junction, Co 81501 <br />940 South 10th Street, P.O. Box 1769 <br />GRAND JUNCTION, COLORADO 87502 <br />J <br />Re: Whitewater permit M- 1977 -129 / T LJ <br />Travis, <br />I <br />NOV 2 3 2011 <br />GRAND JUNCTION 1-1L-ID OFFICE <br />DIVISION OF <br />RECLAMATION MINING & SAFETY <br />Whitewater is requesting a Technical Revision to the above permit. This revision is to <br />address issues in your inspection report of June 2, 2011, recommendation from our <br />meeting September 1, 2011 and more. <br />READY MIXED CONCRETE <br />Phone 242 -4843 <br />Stage 2 B: <br />This property is owned by James McCurter. Mr. McCurter has installed 2 inlet <br />pipes on the property that allow his East Creek Water to be diverted into the lake <br />and an outlet pipe. The inlets are a 10" and a 24" corrugated pipe and fed thru <br />open ditch. Both inlets have an area approximately 10 feet on both sides of the <br />pipe that will not be vegetated per land owner request. The outlet is a 24" <br />corrugated pipe. See exhibit A. His diversion of water into the lake has caused a <br />fluctuation in the lake level on an area around the lake that is void of vegetation. <br />Mr. McCurter desires to operate his lake in this manner as stated in his August 15, <br />2011 letter. As such Whitewater requests a change to the reclamation plan for this <br />lake area to leave an un- vegetated area around the lake of approximately 6 feet <br />above natural lake level. See exhibit A. <br />Stage 2 A: <br />This property is owned primarily by Shawn Ridgley with a small portion owned <br />by us. Mr. Ridgley purchased the property this summer as a lake to water ski on. <br />He has added a volleyball court to the property adjacent to the building site in the <br />southwest corner of the lake, see exhibit A. Also shown on exhibit A is an area <br />adjacent the other building site on the northwest corner of the lake to be left <br />unseeded as a future bike track per Mr. Ridgley's attached letter. This area will <br />not be planted and will be disked annually to control weeds until Whitewater is <br />