Laserfiche WebLink
Division receives HGTI's application for renewal <br />Division issues Proposed Decision to APPROVE HGTI's permit <br />renewal application <br />Operational status was most recently reviewed and summarized by the Division in Permit <br />Renewal 03, dated 03 December 2008. Status and summary of all revisions received and <br />approved by the Division since Permit Renewal 03 are summarized below. <br />Revisions to the Permit <br />Minor Revisions and Technical Revisions which have been made to the Hayden Gulch Loadout <br />permit since the last permit renewal (RN -03) are listed below. <br />lviiilor Revisions: <br />Revision No. <br />MR18 <br />MR19 <br />MR20 <br />MR21 <br />Approval date <br />10/23/2009 <br />03/02/2010 <br />09/09/2010 <br />11/19/2010 <br />Permit Revision 01 Review Process <br />Nature of revision <br />26 November 2007 <br />3 December 2008 <br />Update Ownership and Control Information <br />Change Local Contact and Entity Name <br />Change in Organizational Structure <br />Midterm Responses <br />The Division received the PR -01 application from Hayden Gulch Terminal, LLC on 18 July <br />2011. The submittal included a revision application form, proposed public notice, and changes <br />to permit text and maps to increase the permit area by 214.7 acres by incorporating the Tie - <br />Across Haul Road (TAHR), currently part of the Seneca II -W (C- 1982 -057) permit, into the <br />HGT permit. An additional 96.6 acres of surface disturbance was proposed with PR -01. <br />The PR -01 application was deemed complete on 28 July 2011. Public Notices were published in <br />the Steamboat Pilot and Today for four consecutive insertions beginning on 14 August 2011 and <br />ending on 04 September 2011. Copies of the application were filed with the Hayden Public <br />Library, and the Denver office of the Division. No comment letters were received by the <br />Division in reference to PR -01 <br />The Division sent twenty -one preliminary adequacy review comments to HGT on 21 September <br />2011. HGT submitted preliminary adequacy responses on 01 November 2011 which adequately <br />addressed all of the Division's questions. <br />Notice of Violations <br />No violations were written from the period of the approval of Permit Renewal 03 until the <br />present approval of Permit Revision 01. <br />Hayden Gulch Loadout 6 November 22, 2011 <br />