Laserfiche WebLink
6 <br />1 also an allowance for additional machine time to <br />2 address erosion issues outside of the specific road <br />3 construction. We were very happy with that bid, and we <br />4 believe we had a qualified contractor on line. <br />5 The Corley Company objected to our <br />6 design and to the project for a number of reason, and <br />7 I'll let the Corley Company address those issues, and <br />8 the Corley Company directed us to cancel the project, <br />9 which is what we did. <br />10 We notified the contractor accordingly, <br />11 and I followed up with a letter to the Corley Company <br />12 indicating that pursuant to their wishes the project <br />13 had been canceled and that we would not be doing any <br />14 further reclamation at this location. <br />15 Shortly thereafter, the Corley Company <br />16 requested your attention, and we've scheduled it <br />17 accordingly. That's all I've got by way of <br />18 introduction. Really the floor belongs to the Corley <br />19 Company. <br />20 MR. STARNER: Does anybody have any <br />21 questions for -- <br />22 MR. PAULIN: Pretty clear. <br />23 MR. STARNER: Pretty clear. When did <br />24 you say that was revoked? <br />25 MR. BERRY: I don't have an exact year <br />