Laserfiche WebLink
1 <br />12 <br />1 chewed on and that there would be no variance from the <br />2 bid, no variance from the plan of the project and it <br />3 was all or nothing. <br />4 And at that point we said we don't want <br />5 to waste these precious dollars, and we declined to see <br />6 the project go through. Yes, I have asked for a <br />7 session with you folks to at least bring you my <br />8 concerns, and I have six specific questions. <br />9 Has the available money been spent <br />10 wisely? Probably not something the board can say yes <br />11 or no at this point. What are the landowner's right? <br />12 Does the landowner have the right to exclude a division <br />13 employee for cause? Does the landowner have a right to <br />14 prevent additional undisturbed areas from being used as <br />15 fill material? <br />16 Dave tells me that other folks in AML <br />17 say that they didn't even have to come to staff for <br />18 permission on that. Is the division correct that no <br />19 more reclamation will be done at GEC? And if no more <br />20 reclamation should be done, should the division stop <br />21 inspecting? <br />22 I have also asked OSM to attend the <br />23 meeting this morning and have requested if they have <br />24 any suggestions because they, too, have inspected the <br />25 site in February, and they found that there was <br />