Laserfiche WebLink
Mr. Laroche and Mr. Tuttle <br />Page 3 <br />November 28, 2011 <br />6.4.4 EXHIBIT D - Mining Plan <br />4. Please explain why the description including the drainage easement in the Brown <br />Subdivision was not removed and why the plat of the Brown Subdivision is still included <br />as within the permit boundary. <br />6.4.5 EXHIBIT E — Reclamation Plan <br />5. Please provide some narrative as to whether the U.S. Army Corps of Engineers (COE) <br />has been notified of the intent to construct a levee along the Arkansas River on the south <br />edge of the proposed Phase 7 area. Note the Operator must obtain prior approval from <br />COE prior to engaging in any proactive work along the Arkansas River floodplain and <br />must maintain the 100 -foot setback as approved in 1986. <br />6.4.6 EXHIBIT F — Reclamation Plan Map <br />6. Rule 6.2.1(2)(b) requires Maps and Exhibits be prepared and signed by a registered land <br />surveyor, professional engineer, or other qualified person. Please include the appropriate <br />signature and date on both Exhibit F and Exhibit F — Reclamation Sections. <br />7. Exhibit F — Reclamation Sections: The Reclamation Section Adjacent to the Arkansas <br />River indicates a 3:1 slope between the 100 -ft offset and the backfill area. However, the <br />horizontal dimension suggests the slope will be 2:1. Please correct the horizontal <br />dimension to 33'. <br />These Exhibits are adequate as submitted. <br />These Exhibits are adequate as submitted. <br />EXHIBITS G, H, I, J, and K <br />6.4.12 EXHIBIT L — Reclamation Costs <br />This section is adequate as submitted; there is adequate information to review reclamation <br />costs. However, the Division is continuing to review quantities and unit costs and may revise <br />the estimated cost at a later time. <br />6.4.13 EXHIBIT M — Other Permits and Licenses <br />8. The Exhibit M table needs to include the following permits: <br />a. Supplemental Water Supply Plan discussed in Exhibit G, on page 7. <br />b. COE approval to construct a levee as discussed in Comment 4 above. <br />EXHIBITS N, P, O, R, and S <br />