My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-21_REPORT - M2005065
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2005065
>
2011-11-21_REPORT - M2005065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:52:30 PM
Creation date
11/22/2011 12:48:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005065
IBM Index Class Name
REPORT
Doc Date
11/21/2011
From
Jack Clark Jr
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13. Attach a map to this report that accurately depicts the permit boundary, current affected area boundary and <br />location of the acreages specified in Items 7 -12 and 14. Please check the appropriate response below: <br />UPDATED MAP ATTACHED: CONDITIONS UNCHAGED - PREVIOUS MAP ACCURATE: <br />14. Is weed control being conducted in accordance with an approved Weed Control Plan? () NO N/A <br />If "YES ", indicate the weed species, ; ntrol•area, control tyke, application rate and treatment date on the <br />report map. 190 /4)E'e.,9 pire.e.5 ��� -af <br />15. Is adequate topsoil reserved for reclamation, based on your approved permit? NO N/A <br />If "NO", please explain: <br />16. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1,9(1)? 65) NO N/A <br />If "NO" please explain: <br />-17. If mining has exposed groandwater,.is the site in plianee.wIth the approved mining and Office of the <br />State Engineer (Well Permit S.W.S.P., and/or Permanent Augmentation Plan)? <br />X e l dolts ilnat s stored with n p roved spill containme�rt strrxdures? YES NO <br />19. Is your financial warranty value sufficient to cover the cost to complete reclamation? 1 1E7 NO N/A <br />20. Is your basis for legal right to enter is still valid? NO <br />21. Does your permit require you to submit monitoring information annually? <br />If "Yes", please attach the required monitoring results to this annual report. <br />Please provide current contact Information: <br />Date <br />YES <br />NO N/A <br />N/A <br />I, the undersigned, hereby state that the information provided in this report is true and accurate, and that site <br />operations are being conducted in accordance with the Division approved mining and reclamation plans. <br />Asie <br />P ermittee Contact: <br />- <br />LJ ACk cemek -3 g , <br />Permittee Company: <br />�+ <br />JI ° i N;Oftii, jA1YD <br />f2AVe <br />Address: <br />3$ /f CovAef Rona <br />S / /ten for✓, l • 17403 <br />Pa Bog 717 <br />Phone Number: <br />970 - 387 -.5243 <br />Fax Number: <br />r7o 9. 317 - 61?! <br />Email Address: <br />J12 8/ 6e lice, Cow <br />13. Attach a map to this report that accurately depicts the permit boundary, current affected area boundary and <br />location of the acreages specified in Items 7 -12 and 14. Please check the appropriate response below: <br />UPDATED MAP ATTACHED: CONDITIONS UNCHAGED - PREVIOUS MAP ACCURATE: <br />14. Is weed control being conducted in accordance with an approved Weed Control Plan? () NO N/A <br />If "YES ", indicate the weed species, ; ntrol•area, control tyke, application rate and treatment date on the <br />report map. 190 /4)E'e.,9 pire.e.5 ��� -af <br />15. Is adequate topsoil reserved for reclamation, based on your approved permit? NO N/A <br />If "NO", please explain: <br />16. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1,9(1)? 65) NO N/A <br />If "NO" please explain: <br />-17. If mining has exposed groandwater,.is the site in plianee.wIth the approved mining and Office of the <br />State Engineer (Well Permit S.W.S.P., and/or Permanent Augmentation Plan)? <br />X e l dolts ilnat s stored with n p roved spill containme�rt strrxdures? YES NO <br />19. Is your financial warranty value sufficient to cover the cost to complete reclamation? 1 1E7 NO N/A <br />20. Is your basis for legal right to enter is still valid? NO <br />21. Does your permit require you to submit monitoring information annually? <br />If "Yes", please attach the required monitoring results to this annual report. <br />Please provide current contact Information: <br />Date <br />YES <br />NO N/A <br />N/A <br />I, the undersigned, hereby state that the information provided in this report is true and accurate, and that site <br />operations are being conducted in accordance with the Division approved mining and reclamation plans. <br />Asie <br />
The URL can be used to link to this page
Your browser does not support the video tag.