Laserfiche WebLink
- . <br />Total acres <br />backfilled: <br />- - <br />a <br />r -. - r <br />Total acres <br />seeded w/ <br />approved mix <br />�- - <br />0 <br />-• — <br />To& acres <br />w /topsoil <br />replaced: <br />mow- •� <br />0 <br />> a s Lfr <br />Total a s <br />mulched w/ <br />approved mulch: <br />« t <br />0 <br />Total acres <br />graded: <br />f"1 <br />Total acres <br />fertilized w/ <br />apvd fertilizer: <br />,I'} <br />t/ <br />Topsoil <br />replacement <br />depth (inn.)! <br />/� <br />t�/ <br />Mulch application <br />rate (tons): <br />0 <br />V <br />Seed <br />application <br />method: <br />Fertilizer <br />application <br />method: <br />Mulch <br />application <br />method: <br />Permit #: M- 2(305 -065 <br />According to CAS. 34- 32.3 -116 or 34-32 -116, each year, on the anniversary date of the permit, an operator shall <br />submit the annual fee, an animal report and map showing the extent of current disturbances to affected land, <br />required monitoring information, reclamation accomplished to date and during the preceding year, any new <br />disturbance that is anticipated to occur during the upcoming year, any reclamation that will be performed during <br />the upcoming year, the dates for the beginning of active operations, and the date active operations ceased for the <br />year, if any. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that site is not in compliance with the tiles <br />and the act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12 (1) G) NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2) NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES 63 <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? s;1;.1 I ' t -I <br />5. Does the mine operate more or less than 180 days per year? MO • r LESS <br />If "LESS", please review Rule 1.13 to assure that your mine is in compliance. <br />e ff <br />6. Has this nine been granted: a) approval of TEMPORARY CESSATION Status? YES <br />b) approval for INTERMITTENT OPERATION? YES <br />7. Number of acres currently affected (raining + incomplete and or unreleased reclamation) /6, 3 <br />8. Number of acres that were newly affected during the current report year. 140l <br />9. Number of acres that were reclaimed during the current report year. // NI 9 <br />-10. Estimated new acreage to be affected in -the next report year. <br />11. Estimated acres to be reclaimed in the next report year. m77-•P <br />• 12. Total acres in various ages of reclar tionyssince permitted mipl astivitie; began: <br />