My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-22_PERMIT FILE - M2011054
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011054
>
2011-11-22_PERMIT FILE - M2011054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:16 PM
Creation date
11/22/2011 10:55:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011054
IBM Index Class Name
PERMIT FILE
Doc Date
11/22/2011
Doc Name
New 112c application
From
Oldcastle SW Group, Inc. dba United Companies
To
DRMS
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase <br />Permit Area <br />Mined Acreage <br />(Affected Area) <br />Years to mine* <br />I <br />15 acres <br />11.6 acres <br />3.5 <br />2 <br />15 acres <br />11.6 acres <br />3.5 <br />3 <br />15 acres <br />11.6 acres ** <br />3.5 <br />TOTAL <br />45 acres <br />34.8 acres ** <br />10.5 <br />Exhibit D — Mining Plan <br />Paul Banks and Associates, LLC <br />Overview <br />The Debeque Sand and Gravel Resource includes 45 acres in the permit boundary, of <br />which up to 40 acres, approximately, is to be mined (see Timetable, below). Accessory <br />facilities, such as a scale house and concrete and asphalt plants, are incorporated into <br />this Mining Plan (see Exhibit C). <br />The reclamation of the property will be done concurrently with mining as mining <br />progresses generally south. For planning purposes, the market for construction <br />materials from the proposed resource is assumed to average roughly 500,000 tons per <br />year. This estimate shall not confine the operator to a small or large market if conditions <br />vary from the current estimated annual demand. <br />Timetable <br />The proposed operation is a relatively short- duration sand and gravel operation, with an <br />approximate timetable as illustrated below. Concurrent reclamation will commence, as <br />currently estimated, by the time 10 acres have been mined, if not sooner. <br />* Subject to market conditions. <br />** An additional 5.2 acres could be mined if the irrigation ditch is relocated to an off- <br />site or other acceptable location, allowing for gravel recovery under the present - <br />day ditch alignment. <br />Description of Overburden, Deposit and Underlying Stratum <br />The alluvial deposit at the subject site consists of sand and natural gravel, as well as <br />larger unconsolidated stone material. Overburden varies from non - existent to over 8 <br />feet at the most upland (easterly) points on the site. Shale bedrock underlies the <br />aggregate deposit to be mined. Depth of the deposit varies; at its deepest, the <br />excavation will encounter bedrock at approximately 42 feet beneath the land surface. <br />Debeque Sand and Gravel Resource 11019 <br />Oldcastle Southwest Group, Inc. 7 November 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.