Laserfiche WebLink
Paul Banks and Associates, LLC <br />According to the plans submitted as part of this Regular 112 Permit application, the <br />Debeque Sand and Gravel Resource would be mined in three phases, progressing <br />generally from the north to the south, but allowing for variation in direction or concurrent <br />operations in more than one location to achieve reclamation goals. <br />The operation would involve dewatering to expose and dry out aggregate materials, on- <br />site sorting and processing, and asphalt and /or concrete manufacturing as appropriate to <br />market conditions and subject to other permitting that may be necessary. <br />The proposed post- mining land use is rangeland. The operator will stabilize soils and <br />establish vegetation, preparing reclaimed land in accordance with Mined Land <br />Reclamation standards. Concurrent reclamation techniques will be used to make <br />previously mined areas suitable for release as mining activities progress. This plan <br />would allow for incremental release of financial warranty for reclaimed areas. <br />Debeque Sand and Gravel Resource 11019 <br />Oldcastle Southwest Group, Inc. 3 November 2011 <br />