My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-25_REVISION - M1982155
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982155
>
2011-10-25_REVISION - M1982155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:24:24 PM
Creation date
11/22/2011 7:03:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982155
IBM Index Class Name
Revision
Doc Date
10/25/2011
Doc Name
Adequacy Review
From
DRMS
To
Blue Earth
Type & Sequence
AM1
Email Name
BMK
TAK
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />October 25, 2011 <br />Mr. Bill Schinderline <br />Blue Erath <br />P.O.BOX 973 <br />Fort Collins, CO 80522 <br />Dear Mr. Schenderline <br />Mined Land Reclamation <br />STATE OF COLORADO <br />Re: Schmidt Construction Inc. Fountain Pit, DRMS File # M- 1982 -155, Amendment #1 <br />Adequacy Review. <br />COLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />— &— <br />SAFETY <br />John W. Hickenlooper <br />e povernor <br />Mike King <br />Executive Director <br />Loretta Pifieda <br />Director <br />The Division of reclamation Mining and Safety (Division) has completed its preliminary <br />adequacy review of your 112 Construction Materials Amendment Application. The Amended <br />Application was received on September 19, 2011. Since Schmidt Construction waived its right to <br />a 90 day decision, after the original amendment application was submitted in January 2011, the <br />new decision date for the amended application is December 26, 2011. The amendment <br />proposes to add 49.8 acres to the permit for total permit area of 742.8 acres. <br />Please be advised that if you are unable to satisfactorily address any concern identified in the <br />review before the decision date, the Division will extend the date as needed. Your original <br />written 90 day decision waiver allows the Division to change the date as needed as long as <br />there are no objections to your application. If there are objections to your application that <br />are not resolved and the matter has to be brought before the Mined Land Reclamation Board, <br />the matter will have to be brought before the Mined Land Reclamation Board with 120 days <br />from the date the application was called complete. <br />Exhibit "D" Mining Plan 6.4.4 <br />Under the exhibit, the operator states," Due to the small size of the amendment parcel, mining <br />will not be subdivided in phases or areas. However two options are included in the mining plan <br />(see Exhibit C -4, Pre - Mining and Mining Plan Map- option 1 and Exhibit C -5 PRE - MINING AND <br />Mining Plan Map- option 2). At this point, Charter Oak Ranch Road separates the proposed <br />amendment area from the existing Fountain Pit permit area. The property and mineable <br />material beneath the road are owned by Edward C.Leavy Company, the parent company of <br />Schmidt Construction Company. There are no recorded easements or right of way for the road ". <br />1) Even though the mineral rights underneath the road are owned by the parent company <br />of the operator and the mineral can be removed, the Division cannot accept two <br />conceptual mining plans. Schmidt Construction must submit one of the options in the <br />]i 7 1 A) <br />Office of 1 � Offit;e of <br />Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.