Laserfiche WebLink
November 15, 2011 C- 2009 - 087 /Peabody Sage Creek Mine JDM <br />-fir 'f` tf° �,� r. _ _ -, ►� '�IP�I �"�i. <br />Lower Sump <br />GENERAL MINE PLAN COMPLANCE: <br />The Peabody Sage Creek Mine was permitted in 2010 with initial construction activities beginning in May 2011. <br />At the time of the inspection, topsoil salvaging and storage is complete. The construction of ditches, construction <br />of the facilities area, and the construction of south facilities is ongoing. <br />Portal Sumps and Wire Mesh Installation <br />OTHER (SPECIFY): <br />This was a complete coal inspection conducted by Jason Musick of CDRMS. Jay James of Peabody Energy <br />accompanied the inspection. The weather was cloudy and the site was wet and snow covered during the <br />inspection. Construction activities continue at the site with the development of facilities areas. Development of <br />the portals has yet to occur. Steel mesh was being installed on the highwall face at the portal area. <br />ROADS — Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 4 of 7 <br />