My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-17_INSPECTION - C2009087
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C2009087
>
2011-11-17_INSPECTION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:05 PM
Creation date
11/18/2011 8:37:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Inspection
Doc Date
11/17/2011
Doc Name
Inspection Report
From
DRMS
To
Peabody Sage Creek Mining, LLC
Inspection Date
11/15/2011
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 15, 2011 C- 2009 - 087 /Peabody Sage Creek Mine JDM <br />stable with no problems noted. The discharge was clear. The amount of discharge was not identified through the <br />flume. However, the recording station was observed and functioning as required. <br />The Pecoco Pond contained water and was discharging into the upper sump as permitted at the time of the <br />inspection. The embankments were stable and well vegetated at the time of the inspection. The primary CMP <br />spillway was in good condition and the emergency spillway was stable with no problems noted. The Pecoco Pond <br />had no problems noted. <br />Pond 003 was holding water and had a small amount of discharge at the time of the inspection. The pond <br />embankments were snow covered and stable. The emergency spillway was stable and the primary spillway was <br />functioning as designed. No problems were noted. <br />Culverts and ditches located outside of the South Facilities Area were snow- covered at the time of the inspection. <br />Culverts SCM2, SCM3, SC17, SC18, SC19, SC9 and SC11 were observed during this inspection. All culverts <br />were in place with no problems noted. <br />The upper sump was holding water at the time of the inspection. Water was discharging from the Pecoco Pond <br />into the upper sump with no discharge noted from the upper sump into ditch RC -D3. The embankments of the <br />upper sump have been seeded and were stable at the time of the inspection. <br />Upper Sump <br />The lower sump construction has been completed. The lower sump was holding water with no discharge noted. <br />The embankments were stable with no problems noted. <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.