My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-17_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-17_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:30 PM
Creation date
11/18/2011 7:07:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
11/17/2011
Doc Name
Weeklt Construction Quality Assurance ("CQA") Reports: Weeks of 10/16/2011 & 10/23/2011.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
TC1
BMK
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D) Geomembrane Acceptance <br />1) VLF <br />Primary 80mil geomembrane (P1213- P1326) shown on Figure 2 was inspected by AMEC and <br />Lonestar representatives and found to be installed within project specifications and acceptable <br />for continued construction activities. <br />CQA ACTIVITIES: <br />SUMMARY: <br />Geomembrane acceptance is complete for the Phase 5 VLF. The figure will be removed from <br />this report from this week forward. <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed snow removal within the Phase 5 VLF. <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />AMEC observed the back fill of anchor trenches within the Phase 5 VLF. <br />AMEC observed the installation of the high volume solution collection system within the Phase 5 VLF. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process area. <br />AMEC observed the DCF placement within the Phase 5 VLF. <br />AMEC inspected and approved 80mil primary geomembrane within the Phase 5 VLF <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture- Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />VLF Weekly Report WE 10.29.2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.