D) Geomembrane Acceptance <br />1) VLF <br />Primary 80mil geomembrane (P1213- P1326) shown on Figure 2 was inspected by AMEC and <br />Lonestar representatives and found to be installed within project specifications and acceptable <br />for continued construction activities. <br />CQA ACTIVITIES: <br />SUMMARY: <br />Geomembrane acceptance is complete for the Phase 5 VLF. The figure will be removed from <br />this report from this week forward. <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed snow removal within the Phase 5 VLF. <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />AMEC observed the back fill of anchor trenches within the Phase 5 VLF. <br />AMEC observed the installation of the high volume solution collection system within the Phase 5 VLF. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process area. <br />AMEC observed the DCF placement within the Phase 5 VLF. <br />AMEC inspected and approved 80mil primary geomembrane within the Phase 5 VLF <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture- Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />VLF Weekly Report WE 10.29.2011 <br />