Laserfiche WebLink
CQA ACTIVITA;S: <br />SUMMA Y: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed existing Phase IVC geomembrane exposure. <br />AMEC observed and assisted in the placement of the SLF berm. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture- Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue SLF berm <br />Geomembrane installation <br />Anchor trench excavation and backfill <br />Drain cover fill placement <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V• <br />CC &V held a weekly construction meeting on October 18, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />None <br />Summary of Incidents /Accidents/Health & Safety Issues: <br />None <br />We trust the information provided clearly represent <br />October 22, 2011. <br />Approved By: <br />Joseph Hickey, CQA Monito <br />ur findings and observations for the week ending <br />Date: October 22, 2011 <br />ate: #s 6f I / <br />PIVCBR Weekly Report WE 10.22.2011 <br />