My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-17_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2011-11-17_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:07 PM
Creation date
11/18/2011 7:07:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/17/2011
Doc Name
Weekly VLF Earthworks Field Monitoring Reports: Weeks of 10/16/2011 & 10/23/2011.
From
CC&V
To
DRMS
Type & Sequence
TR62
Email Name
TC1
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CQA ACTIVITA;S: <br />SUMMA Y: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed existing Phase IVC geomembrane exposure. <br />AMEC observed and assisted in the placement of the SLF berm. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture- Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue SLF berm <br />Geomembrane installation <br />Anchor trench excavation and backfill <br />Drain cover fill placement <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V• <br />CC &V held a weekly construction meeting on October 18, 2011. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />None <br />Summary of Incidents /Accidents/Health & Safety Issues: <br />None <br />We trust the information provided clearly represent <br />October 22, 2011. <br />Approved By: <br />Joseph Hickey, CQA Monito <br />ur findings and observations for the week ending <br />Date: October 22, 2011 <br />ate: #s 6f I / <br />PIVCBR Weekly Report WE 10.22.2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.