Laserfiche WebLink
Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />- <br />D <br />D <br />D <br />D <br />D <br />D <br />D = Day Shift N = Night Shift <br />!. <br />Eme <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase IVC Berm Modification <br />Date: October 22, 2011 <br />Reporting Period: 10/16/11 through 10/22/11 <br />Project No.: 84201125E0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Ambient Temperature Range (F): Low: 23 °F to 34 °F ( + / -) High: 44 °F to 58 °F ( + / -) <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES/Lonestar: None <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Phase IVC Berm Modification <br />A) Geomembrane <br />1) Geomembrane Exposure <br />Approximately 350' of existing installed Phase IVC geomembrane was exposed using a John <br />Deere 35D excavator and laborers. An AMEC field representative observed the geomembrane <br />exposure constantly. <br />B) Soil Liner Fill <br />1) Berm Modification <br />Soil liner fill (SLF) placement was performed using a CAT 950 front -end loader and a John <br />Deere 35D excavator. Compaction was achieved using a vibratory plate compactor and <br />laborers. The berm was constructed in accordance with design drawings and project <br />specifications. <br />PIVCBR Weekly Report WE 10.22.2011 <br />