Laserfiche WebLink
Month <br />Total <br />Lagged <br />Mining <br />Depletions <br />(acre -feet) <br />(A) <br />Replacements <br />from Aurora <br />(acre -feet) <br />(B) <br />Transit <br />Losses <br />(acre -feet) <br />(C) <br />Water Balance <br />(acre -feet) <br />(D) <br />Nov -11 <br />10.77 <br />12.4 <br />0.87 <br />0.76 <br />Dec -11 <br />9.58 <br />11.1 <br />0.78 <br />0.75 <br />Jan -12 <br />8.68 <br />10.2 <br />0.71 <br />0.81 <br />Feb -12 <br />8.32 <br />9.8 <br />0.69 <br />0.79 <br />Mar -12 <br />8.59 <br />10.1 <br />0.71 <br />0.80 <br />Apr -12 <br />9.88 <br />11.4 <br />0.80 <br />0.73 <br />May-12 <br />11.77 <br />13.4 <br />0.94 <br />0.70 <br />Jun -12 <br />13.66 <br />15.4 <br />1.08 <br />0.66 <br />Jul -12 <br />15.49 <br />17.3 <br />1.21 <br />0.60 <br />Aug -12 <br />16.70 <br />18.6 <br />1.30 <br />0.60 <br />Sep -12 <br />17.13 <br />19.0 <br />1.33 <br />0.54 <br />Oct -12 <br />16.36 <br />18.2 <br />1.27 <br />0.56 <br />Total <br />146.9 <br />166.9 <br />11.7 <br />8.3 <br />Table No. 2 <br />Lafarge West, Inc. <br />Combined South Platte River Substitute Supply Plan <br />Combined South Platte River Water Balance & Replacement Requirements <br />(A) Total mining depletions from the mining sites. See Table No. 1. <br />(B) Replacement lease from Aurora; see Appendix D <br />(C) Transit losses of 7% from Metro WWTP to sites, (B) *0.07 <br />(D) Water Balance = (B) - (A) - (C) <br />N: \10106 Lafarge SWSPs\SWSPs\South Platte Combined\WY 2012\2012 Estimated Combined Renewal CU.xls <br />r <br />Applegate <br />: Groupo... <br />