Laserfiche WebLink
Month <br />Howe <br />Pit <br />Depletions <br />M -78 -052 <br />(ac -ft) <br />(A) <br />Riverbend <br />West <br />Depletions <br />M -85 -088 <br />(acre -feet) <br />(B) <br />Riverbend <br />East <br />Depletions <br />M -04 -078 <br />(ac -ft) <br />(C) <br />Total <br />Depletions <br />(ac -ft) <br />(D) <br />Nov -11 <br />0.38 <br />1.17 <br />9.22 <br />10.77 <br />Dec -11 <br />0.42 <br />1.04 <br />8.12 <br />9.58 <br />Jan -12 <br />0.46 <br />0.91 <br />7.31 <br />8.68 <br />Feb -12 <br />0.68 <br />0.82 <br />6.82 <br />8.32 <br />Mar -12 <br />0.88 <br />0.86 <br />6.85 <br />8.59 <br />Apr -12 <br />1.04 <br />1.12 <br />7.72 <br />9.88 <br />May -12 <br />1.21 <br />1.62 <br />8.94 <br />11.77 <br />Jun -12 <br />1.35 <br />2.18 <br />10.13 <br />13.66 <br />Jul -12 <br />1.46 <br />2.72 <br />11.31 <br />15.49 <br />Auq -12 <br />1.55 <br />3.09 <br />12.06 <br />16.70 <br />Sep -12 <br />1.63 <br />3.24 <br />12.26 <br />17.13 <br />Oct -12 <br />1.68 <br />3.04 <br />11.63 <br />16.36 <br />Total <br />12.7 <br />21.8 <br />112.4 <br />146:9 <br />Table No. 1 <br />Lafarge West, Inc. <br />Combined South Platte River Substitute Water Supply Plan <br />Lagged Stream Depletions <br />(A) Total lagged mining depletions which reflect existing steady state conditions at the Howe Pit. <br />(B) Total lagged mining depletions which reflect existing steady state conditions at the Riverbend West Pit. <br />(C) Total lagged mining depletions which reflect steady state conditions at the Riverbend East Pit. <br />(E) Total depletions to the South. Platte River, (A) +(B) +(C) <br />N:\10100 Lafarge SWSP.\SWSP. \South Pitt. Cemb..d■WY 20122012 Estimated Combined Renewal CU. N. <br />;Appl;egate <br />