Laserfiche WebLink
Cheryl Signs, P.E. <br />tCheryl Signs Engineering <br />109 East Fourth Avenue <br />Denver, CO 80203 <br />ski/3/o zeMuut.Aef <br />DIVISION OF WATER RESOURCES <br />DEPARTMENT OF NATURAL RESOURCES <br />November 16, 2011 <br />Re: Durham Pit, Substitute Water Supply Plan (WDID 0302535) 2nd Amendment <br />DRMS File No.40I- 1978 -056 (WDID 0303029) <br />Sections 3, 9, and 10, T5N, R65W, 6 P.M. <br />Dakolios Pit DRMS File No. M- 1984 -036 (WDID 0503008) <br />Section 31, T3N, R67W, 6 P.M. <br />Water Division 1, Water Districts 3 and 5, Weld County, Colorado <br />Approval Period: January 1, 2011 through December 31, 2012 <br />Contact Phone Number for Ms. Cheryl Signs: 303 - 778 -7653 <br />RECEIv b <br />40V 1 6 2011 <br />Office of the St te Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303 - 866 -3581 • Fax: 303 - 866 -3589 <br />www.water.state.co.us <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Dick Wolfe, P.E. <br />Director /State Engineer <br />Dear Ms. Signs: Division of Reclamation, <br />Mining & Safety <br />This letter is in response to your letter dated September 26, 2011, requesting an amendment to <br />the approval of the Varra Companies Inc, ( "VCI ") Durham Pit Substitute Water Supply Plan ( "SWSP ") <br />dated February 14, 2011, as amended on August 3, 2011. The purpose of this 2" amendment is to <br />include the use of a well with permit No. 57724 -F ( "Felt Well ") (WDID 0304999) which was purchased by <br />VCI and has subsequently been dropped by Star Ready Mix's Feit Pit SWSP (WDID 0302580). All other <br />consumptive uses of the amended SWSP approved for the Durham and Dakolios Pit will remain the <br />same as in the August 3, 2011 approval. <br />Plan Operation <br />VCI purchased a concrete batch plant located on the Feit Gravel Pit from Star Ready Mix. This <br />purchase included the use of the Feit Well. VCI has assumed responsibility for augmenting all future <br />depletions associated with this concrete batch plant, including all future withdrawals from this well. Star <br />Ready Mix is responsible for all lagged depletions from previous pumping of the well. <br />Depletions <br />The Feit Well is expected to withdrawal 3.23 acre -feet during water year 2012 (WY 2012). See <br />Table 1 for a monthly breakdown of the well's projected withdrawals and depletions. The monthly <br />depletions from this well were lagged to the river using the AWAS program developed by the IDS <br />Group at Colorado State University. The parameters used in the model were an estimated distance <br />from the well to the Cache la Poudre River (X) of 1,000 feet, an estimated distance from the well to the <br />no flow aquifer boundary (W, measured perpendicular to the point of impact) of 4,300 feet, an aquifer <br />transmissivity (T) of 120,000 gpd /ft, and a specific yield (S) of 0.25. <br />The depletion & replacement requirement for the Durham Pit has been amended to include the <br />depletions associated with the Feit Well (See Table 2 - attached). The net annual depletion for the <br />Durham Pit is 52.78 acre -feet. The net annual depletions for the Dakolios Pit are not changed with this <br />amendment and are 7.69 acre -feet. <br />