Laserfiche WebLink
PERMIT #: M -1987 -013 <br />INSPECTOR'S INITIALS: RCO <br />INSPECTION DATE: October 18, 2011 <br />well as the northern boundary fenceline. The operator should make sure that all boundaries remain clearly <br />marked and that all equipment operators and haulers at the site are aware of the need to stay inside the <br />boundary. <br />The northern boundary is shared with an irrigation district's quarry, where similar riprap rock is removed from <br />the other side of the outcrop. The operator's permitted operation does not extend to that other side of the <br />outcrop. <br />Topsoil: <br />The stockpile of fines is currently well protected for reclamation. It will be used for revegetating the benches. <br />For all questions regarding this report, please contact this inspector at the Division's Durango Field Office: <br />DRMS — Durango Field Office <br />691 CR 233, Room A -2 <br />Durango, CO 81301 <br />(telephone: 970 - 247 -5193) <br />Inspection Contact Address: <br />Ralph Martinez <br />Southway Construction Company, Inc. <br />117 White Pine Dr. <br />Alamosa, CO 81101 <br />Page 3 of 4 <br />