My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-08_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2011-11-08_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:52 PM
Creation date
11/9/2011 9:38:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
REVISION
Doc Date
11/8/2011
Doc Name
Technical Review Comments
From
OSM
To
DRMS
Type & Sequence
TR61
Email Name
DAB
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dear Mr. Berry: <br />United States Department of the Interior <br />OFFICE OF SURFACE MINING <br />Reclamation and Enforcement <br />Western Region Office <br />1999 Broadway, Suite 3320 <br />Denver, CO 80202 -3050 <br />November 4, 2011 <br />Mr. David Berry <br />Director, Coal Regulatory Program <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman St. Room 215 <br />_Denver-, _Colorado 80203__ <br />' Although received on November 2, 2011, this letter was erroneously dated October 20, 2011. <br />Re: Technical Review Comments — Permit Revision Application TR -61: Western Fuels - <br />Colorado's Proposed Soil /Overburden Sampling and Analysis Plan for the New Horizon <br />Mine <br />In a letter to the Division of Reclamation, Mining and Safety (DRMS) dated October 14, 2011, <br />OSM had provided review comments on Western Fuels — Colorado's (WFC's) September 30, <br />2011, technical revision application (TR -61). This proposed revision application is applicable to <br />Permit C- 1981 -008 for the New Horizon Mine. The proposed permit revision application <br />includes a plan to conduct sampling and analysis of identified in -place undisturbed soil and <br />stockpiled soil materials, as well as overburden materials that have been redistributed over <br />previously mined and regraded lands. The additional chemical and physical data to be acquired <br />for these Morgan property sites, are to be used in determining what steps (if any) need to be <br />taken to ensure that the prime farmlands mined on this property are eventually reclaimed to a <br />condition that reasonably restores the agricultural yield capability that existed prior to mining <br />In a letter to WFC dated October 14, 2011, you had provided both OSM and DRMS's review <br />comments to the mine operator. In a submittal to DRMS dated October 20, 2011, WFC's <br />consultant (Lewicki & Associates) provided a response to the DRMS's October 14 review letter. <br />In a second letter dated October 31, 2011, you had provided an additional set of sampling plan <br />deficiencies to WFC. This second set of deficiencies had been based largely on those I had <br />conveyed to you in a letter dated October 28, 2011. In a submittal received by your office on <br />November 2, 2011, WFC provided additional information addressing the deficiencies listed your <br />letter dated October 31, 2011. <br />At the request of and in cooperation with DRMS, our office has conducted a technical review of <br />the plans included within WFC's November 2, 2011 TR -61 revised submittal. Please be <br />advised that OSM's review of the amended submittal finds that the review comments we had <br />provided in our above cited letter dated October 28, 2011, have been satisfactorily addressed. <br />Regarding stockpiled soil resources, WFC has revised TR -61 to state that composite soil samples <br />taken at each boring location for sampling of the soil stockpiles will not exceed a sampling <br />interval of 5 feet. This added language allows for adequate soil sampling to reasonably <br />
The URL can be used to link to this page
Your browser does not support the video tag.