Laserfiche WebLink
Task description: <br />Site: Lyster Pit <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Agency or organization name' DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />04A <br />11/2/2011 <br />DMC <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Cat D9T - 9U <br />405 <br />Universal <br />NA <br />1 per day <br />(CRG) <br />Total unit Cost/Hour: $251.56 <br />Total Fleet Cost/Hour: $251.56 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />46,249 <br />1.000 <br />46,249 LCY <br />Source of estimated volume: <br />Spread topsoil over site <br />State: Colorado <br />County: Moffat <br />$72.40 <br />$140.68 <br />$0.00 <br />$38.49 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />0% <br />6,200 feet <br />Material weight: 1,6001bs/LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />BULLDOZER WORK <br />Division of Reclamation, Mining & Safety <br />100 feet <br />1,308.1 LCY /hr <br />Permit Action: TR2 <br />0.750 <br />1.200 <br />1.000 <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />Abbreviation: None <br />Page 1 of 2 <br />Permit/Job #: M2008009 <br />Filename: M009 -04a <br />CIRCES Cost Estimating Software <br />