My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-03_REVISION - M2008009
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008009
>
2011-11-03_REVISION - M2008009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:05:23 PM
Creation date
11/9/2011 9:24:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008009
IBM Index Class Name
REVISION
Doc Date
11/3/2011
Doc Name
TR-02 approval
From
DRMS
To
Connell Resources, Inc.
Type & Sequence
TR2
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loader Worksheet Cont'd Task ti 03A Page 2 of 2 <br />Load Bucket Capacity <br />Rated Capacity: 7.50 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100 -120 %) 1.100 <br />Adjusted Capacity: 8.25 LCY <br />Job Condition Correction Factors <br />Site Altitude: 6200 feet <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />1.00 <br />0.83 <br />Source <br />(CAT HB) <br />(1 shift/day) <br />0.83 multiplier <br />Total Travel Time: 0.8417 minutes <br />Total Cycle Time: 1.3917 minutes <br />Unadjusted Hourly Unit Production: 355.68 LCY/Hour <br />Adjusted Hourly Unit Production: 295.22 LCY/Hour <br />Adjusted Hourly Fleet Production: 590.43 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 2 Loader(s) Total job time: 78.33 Hours <br />Unit cost: $0.531 /LCY Total job cost: $24,561.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.