Laserfiche WebLink
Loader Worksheet Cont'd Task ti 03A Page 2 of 2 <br />Load Bucket Capacity <br />Rated Capacity: 7.50 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100 -120 %) 1.100 <br />Adjusted Capacity: 8.25 LCY <br />Job Condition Correction Factors <br />Site Altitude: 6200 feet <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />1.00 <br />0.83 <br />Source <br />(CAT HB) <br />(1 shift/day) <br />0.83 multiplier <br />Total Travel Time: 0.8417 minutes <br />Total Cycle Time: 1.3917 minutes <br />Unadjusted Hourly Unit Production: 355.68 LCY/Hour <br />Adjusted Hourly Unit Production: 295.22 LCY/Hour <br />Adjusted Hourly Fleet Production: 590.43 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 2 Loader(s) Total job time: 78.33 Hours <br />Unit cost: $0.531 /LCY Total job cost: $24,561.00 <br />CIRCES Cost Estimating Software <br />