My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-28_REVISION - M1977300
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977300
>
2010-04-28_REVISION - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:06:08 PM
Creation date
11/8/2011 12:47:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
REVISION
Doc Date
4/28/2010
Doc Name
Responses to Adequacy Review.
From
Cotter
To
DRMS
Type & Sequence
AM2
Email Name
DB2
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 7, Item 11(G)(1) — Downgradient Bedrock Monitoring Well Installation <br />The monitoring wells were originally scheduled for installation in 2010. Please provide a revised <br />schedule for completion of these two monitoring wells. <br />RESPONSE: <br />The proposed downgradient bedrock monitoring wells will require new disturbance to re -open a <br />previously reclaimed road. It is the operator's understanding that this new disturbance may <br />require an amendment to the mine plan. Contingent on the approval of the mine plan <br />amendment and the availability of a drilling contractor with a buggy- mounted or track - mounted <br />drill rig, the monitoring wells could be completed within four to six weeks after approval by <br />DRMS. A proposed schedule is provided below. <br />RESPONSE: <br />TASK <br />DURATION DATE <br />(Days) COMPLETE <br />TASK 1 - Permitting (Mine Plan Amendment) & Approval <br />Stake proposed locations in the field, calculate disturbance, <br />prepare and submit amendment (AM03) to the mine plan for <br />new disturbance 21 5/31/2011 <br />Approval of Mine Plan Amendment 30 6/30/2011 <br />TASK 2 - Prepare RFP 7 7/7/2011 <br />TASK 3 - Bid Process & Contractor Selection 24 7/28/2011 <br />TASK 4 - Permitting DWR (Notice of Intent, Form GWS -51) 3 7/28/2011 <br />TASK 5 - Site preparation <br />Re -open road with dozer, excavate drill pad 7 8/4/2011 <br />TASK 6 - Well Installation & Completion 17 8/21/2011 <br />Page 7, Item 11(G)(2) — Downgradient Bedrock Monitoring Well Installation <br />On Page 15 -16 the EPP states that water quality sampling "could also be performed" in the <br />proposed monitoring wells. The Operator must commit to quarterly water quality monitoring of <br />the wells, for the standard monitoring well analytical suite that is already in place, until notified <br />otherwise by DRMS. <br />Cotter will sample the wells on a quarterly basis using the DRMS- approved analytical suite. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.