Laserfiche WebLink
Environmental Protection Plan, Schwartzwalder Mine ii <br />17. PLANT GROWTH MEDIUM (SOILS) 17 -1 <br />18. WILDLIFE PROTECTION 18 -1 <br />19. TAILINGS AND SLUDGE DISPOSAL 19 -1 <br />20. REFERENCES 20 -1 <br />Appendix A <br />LIST OF APPENDICES <br />Table 15 -1. Proposed Schedule for Bedrock Monitoring Well Drilling 15 -11 <br />Table 15 -2. Proposed Schedule for Engineering Design, Construction, and Mitigation Activities at the <br />Schwartzwalder Mine 15 -14 <br />Plate 1. <br />LIST OF TABLES <br />LIST OF PLATES <br />LIST OF FIGURES <br />Figure 15 -1. Layout of Sumps and Piping System for Alluvial Groundwater Collection and Treatment 15 -4 <br />Figure 15 -2. Schematic of Ion Exchange Water Treatment System Currently in Operation at the <br />Schwartzwalder Mine 15 -5 <br />Figure 15 -3. Diversion Pipeline Conceptual Design 15 -7 <br />Figure 15 -4. Proposed Locations for Downgradient Bedrock Monitoring Wells 15 -12 <br />Figure 15 -5. Cross Section N52 °W Through Schwartz Trend showing Proposed Locations for <br />Downgradient Bedrock Monitoring Wells 15 -13 <br />4109C.110510 Whetstone Associates <br />