My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-10_REVISION - M1977300
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977300
>
2011-05-10_REVISION - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:11:57 PM
Creation date
11/8/2011 12:46:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
REVISION
Doc Date
5/10/2011
Doc Name
Additional Response and Extension Request.
From
Cotter
To
DRMS
Type & Sequence
AM2
Email Name
DB2
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Protection Plan, Schwartzwalder Mine <br />TABLE OF CONTENTS <br />1. INTRODUCTION 1 -1 <br />2. MAPS 2 -1 <br />3. OTHER ENVIRONMENTAL PROTECTION MEASURES AND MONITORING 3 -1 <br />4. OTHER PERMITS AND LICENSES 4 -1 <br />5. DESIGNATED CHEMICALS EVALUATION 5 -1 <br />6. DESIGNATED CHEMICALS AND MATERIALS HANDLING 6 -1 <br />7. FACILITIES EVALUATION 7-1 <br />8. GROUNDWATER INFORMATION 8 -1 <br />9. GROUNDWATER QUALITY 9 -1 <br />10. SURFACE WATER CONTROL & CONTAINMENT FACILITIES 10 -1 <br />11. SURFACE WATER QUALITY DATA 11 -1 <br />12. WATER QUALITY MONITORING PLAN 12 -1 <br />13. CLIMATE 13 -1 <br />14. GEOCHEMICAL DATA AND ANALYSIS 14.1 <br />15. MITIGATION OPTIONS AND CONSTRUCTION SCHEDULE 15 -1 <br />(a) Description of Constituents of Concern and Potential Sources 15 -1 <br />(b) Remedial Objectives 15 -2 <br />(c) Short-Term Mitigation Options — Pump and Treat with Ion Exchange 15 -3 <br />(d) Short-Term Mitigation Options — Stream Isolation 15 -5 <br />(i) Upstream Cutoff Wall and Diversion Intake Structure 15 -5 <br />(ii) Diversion Pipeline 15 -6 <br />(iii) Downstream Cutoff Walls 15 -6 <br />(e) Long -Term Permanent Mitigation Options — Source Removal 15 -8 <br />(f) Plugging and Abandonment Program 15 -8 <br />(g) Mine Pool Stabilization and Detoxification 15 -9 <br />(h) Monitoring Well Installation 15 -9 <br />(i) Replacement Upgradient Bedrock Monitoring Wells 15 -9 <br />(ii) Downgradient Bedrock Monitoring Wells 15 -10 <br />(iii)Monitoring Well Construction Schedule 15 -10 <br />(i) Schedule for Engineering Design, Construction, and Mitigation 15-14 <br />16. QUALITY ASSURANCE AND QUALITY CONTROL 16 -1 <br />4109C.110510 Whetstone Associates • <br />
The URL can be used to link to this page
Your browser does not support the video tag.