Laserfiche WebLink
October 18, 2011 C -2009- 087 /Peabody Sage Creek Mine JDNJ <br />inspection. No problems were noted. <br />Lower Sump Construction and Pond 002 Upper Sump <br />The portal sumps PS -1 and PS -2 were roughed in with finishing work yet to be conducted. <br />GENERAL MINE PLAN COMPLANCE: <br />The Peabody Sage Creek Mine was pennitted in 2010 with initial construction activities beginning in May 2011. <br />At the time of the inspection, topsoil salvaging and storage is near completion with small construction areas <br />remaining. The construction of ditches, the installation of culverts, final blasting of the the portal areas, <br />construction of the facilities area, and the construction of designed haul and access roads is the current extent of <br />activity on the site. <br />;r . <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Page 3 of 5 <br />